The French company Sleeper Line has entrusted the foundations for several of their modular buildings to Techno Pieux Le Mans-Tours. This construction job needed to install 108 piers to support the modules and the bridges interconnecting the different buildings.
The speed with which the Techno Metal Post installation team worked was much appreciated. They only needed 5 days to put in the piers, and no excavation was necessary. This revolutionary method also allows for removal of the screwed piers without leaving any marks or causing any damage to the earth. In this case, the piers will be removed in one year when the modular buildings will be taken down.
HELICAL FOUNDATIONS
WITH TECHNO METAL POST, IT'S FAST AND EASYTechno Metal Post makes life easier for anyone with a construction project that requires a foundation in almost any type of soil.